COACHES will replace trains along the Echuca train line as part of maintenance and renewal works along the length of the tracks starting this Saturday.V/line passengers will travel on replacement buses to and from Melbourne's Southern Cross Station from 12.45 am on Saturday, June 27 until the last train on Sunday, July 5.
The upgrades will include works to bridges and culverts along the length of the Bendigo line, including the Campaspe River Bridge in Rochester and mud hole removal, which can cause a rough ride.
Temporary timetables are available at vline.com.au/Timetables/Service-changes
The latest public transport information and network status is available at ptv.vic.gov.au or in the PTV mobile app.